Skip to product information
For Samsung Galaxy Z Flip 5 4 Fold 5 4 3 5G Charger Cable Long Lead USB 1m 2m 3m
£3.99
🚚 FREE UK Delivery on every order
- FREE Royal Mail Tracked 48 on orders £15+
- Royal Mail Tracked 24 – £4.99
- Next working day Special Delivery – £9.99
- 10% off everything at checkout
- 3-month warranty · UK seller
A fast USB-A to USB-C charging and data cable for Samsung Galaxy Z Flip and Z Fold phones.
Features
- USB-A to USB-C
- Fast charging up to 3A (with a fast-charge adapter)
- Charges and syncs data at up to 480Mbps
- Braided nylon with pure copper conductors
- Available in 1m, 2m or 3m
- Colours: black, blue, red or rose
Compatible with
- Samsung Galaxy Z Flip 4, Z Flip 5
- Samsung Galaxy Z Fold 4, Z Fold 5
- Samsung Galaxy S22, S23
- Other USB-C phones and devices
Choose your cable length and colour from the options above.
Please check your device has a USB-C charging port before ordering.
Cable only – a mains plug is not included.
Sold by Speedy Trading Ltd, a UK seller. FREE UK delivery and a 3-month warranty on every order.